Projects

Crowne Plaza Hotel

Gurgaon

Quality and aesthetic value of a building structure means everything in the hospitality industry. Today Hotels Pvt. Ltd., a developer of both residential and commercial real estate properties, had visions of building the finest, most modern business hotel with features in Gurgaon and Delhi.

In order to achieve their goal of opening the hotel at the earliest, Today Hotels needed a complete waterproofing solution that could be easily installed and not delay the construction process; yet provide proven and permanent results.

DOWNLOAD CASE STUDY

 


 

JLPL, Sky Garden

Chandigarh

Janta Land Promoters Limited (JLPL), are one of the most renowned names in residential construction in the Chandigarh tri-city area. When they started construction of their 11 towers project they knew that the entire structure had to be a 100% watertight.

Kryton did several trials to get the entire decision-making team on board. Finally, KIM was used in the raft and garden Slab, T1 was used in the retaining wall, a combination of T1 and Baricote was used for the joints and finally Roof-Gardi was used for the open gardens and podiums. Today, JLPL, has become one of our most loyal customers.

DOWNLOAD CASE STUDY

 


 

Oysters Beach Water Park

Gurgaon, Haryana

When you are waterproofing a water park, you know the stakes are high, and even more so if the park is situated right next to the busiest metro station.

The 2 most awaited rides Crazy River and Lazy River have been waterproofed by Kryton products Krystol T1 and Krystol T2 and have proven to be the right solution.

DOWNLOAD CASE STUDY

 


 

Bharat Oman Refinery Limited

Bina, Madhya Pradesh

Bharat Oman Refinery Limited was facing a problem. The reservoir made to keep water safe was leaking and needed to be repaired ASAP. Their consulting group EIL suggested Kryton to them.

The team visited the site to understand the requirement. After a thorough investigation Kryton recommended using a screed admixed with KIM for the slabs along with filling the joints with Krystol T1 and Krystol Baricote. The results were for everyone to see and admire. The project was completed on time and in budget.

DOWNLOAD CASE STUDY

 


 

Indira Gandhi International Airport

New Delhi, Delhi

The primary civilian aviation hub for the National Capital Region of Delhi, India the airport, is spread over an area of 5,106 acres and is the busiest airport in the country in terms of passenger traffic since 2009. It also has one of the largest Duty Free Layouts in India.  

The officials were looking for a solution for their ceiling slab. The main concern was needing a solution that would work from the negative side. The Kryton team after in-depth consultation with the client and various site visits recognized the need for Krystol T1 & T2 system at various parts of the airport including the overhead area of the duty free. The system worked successfully.

DOWNLOAD CASE STUDY

 


 

Alaknanda Dam

Srinagar

Consistent electricity is one of the major issues facing India; in 2005 GMR Energy started developing a 330 megawatt hydroelectric dam and power plant in Uttarakhand, just outside the town of Srinagar to help satisfy the growing demand for power. 

The local town of Srinagar is all too familiar with the devastation of floods. In 1894, over 280 million cubic meters (10,000 million cubic feet) of water from the breached Gohna Lake completely swept away the original town of Srinagar. 

Due to the extreme risk potential in building and waterproofing the dam, the team at Alaknanda brought Kryton on-board in 2010 to waterproof key areas of the dam. As they knew the disastrous consequences of bad waterproofing. Kryton’s system can add decades to the life of concrete structures and unlike membrane systems that can deteriorate over time, the Kryton system becomes a part of the concrete matrix, waterproofing from the inside out.

DOWNLOAD CASE STUDY

 


 

Kochi Refinery

Kerala

Based in the State of Kerala, The Bharat Petroleum Corporation Limited (BPCL) Kochi Refinery has a capacity of 310000 barrels per day. It is one of the largest refineries in India.

When they needed to build waterproof reservoirs, they decided on Kryton’s award winning technology. After complete research and testing, the refinery used KIM for their reservoirs and water containment structures.

 

 


 

Gujarat Sadan

New Delhi

On completion, this landmark building will have 69 guest rooms including meeting room and a lounge for the use of the government purposes. There is a need for this building to be completely waterproof as it stands tall in the middle of the heart of the capital. So, when NBCC needed the right product to waterproof the structure they chose the Kryton Solution.

KIM was used in the slabs and retaining wall and joints were treated with Krytonite Swelling Waterstop one of the most unique waterproofing products present in India.

 

 


 

Adani Dhamra Port

Orissa

Dhamra is one of the deep draft ports of India with a draft of 18 meters, which can accommodate super cape-size vessels up to 180,000 DWT. It is an all-weather, multi-user, multi-cargo port with a potential to handle more than 100 MMTPA of dry bulk, liquid bulk, break bulk, containerized and general cargo.

Complete Kryton Solution was used to waterproof the, sub structure of the port such as the raft and Diaphragm wall.