BACKGROUND JLPL, are one of the most renowned names in residential construction in the Chandigarh tri-city area. When they started construction on their one-of-a-kind prestigious residential project, the Sky Gardens, they wanted to make a statement. The entire project with 11 towers had Gardens at the very top and landscaped across the entire complex.The complex … Read More
Determining the Exact Time Concrete Reaches Strength Targets Background The Østerport Station in Copenhagen contained several prestressed floors that were going to be used in a multi-story project. However, before tensioning, each floor required the concrete to reach minimum strength development. To determine if the concrete had reached its required strength, the contractor conducted crush … Read More
Waterproofing Rides Background This much awaited, highly anticipated project, is right next to one of the busiest Metro stations in Gurgaon. This water park has two great water slides, Crazy River and Lazy River. The developer and contractor needed a solution for both. They required a solution that would work from the something from the … Read More
Protecting the Integrity of One of the Largest Sources of Uranium in Namibia Background Known as one of the largest reserves for uranium in Namibia, the Trekkopje mine is located in Western Namibia, approximately 65 km northeast of Swakopmund. As part of its maxi project’s construction, the mine was envisioned as a composite of numerous … Read More
Providing a Watertight Structure That Can Endure a High Water Table Environment Background Planning to transform the area around Elmbridge Way and Hollybridge Way into the largest urban community in Richmond, the Onni Group started off with an ambitious design for a structure known as the Ora. This design called for three splendid towers that … Read More
Developing Cost-Effective Flooring for Gibraltar Mine Background Taseko Mines Ltd.’s Gibraltar copper-molybdenum mine is located in south-central British Columbia, approximately 60 km (37 mi) north of the City of Williams Lake. Built in 1972, the Gibraltar Mine is the second largest open-pit copper-molybdenum mine in Canada. As part of the mine’s multi-phase expansion and modernization … Read More
Background Located near the town of Sechelt, British Columbia, and accessible by barge only, the Bear Creek Hydro facility is one of a number of sustainable energy sources in Canada. It maintains its sustainability thanks to its ability to generate electricity through a run-of-river (ROR) hydro, which is powered by natural stream flows and their … Read More
Background The award-winning Vancouver Convention Centre’s new West building boasts 338,000 ft2 of function and meeting space and has become a showpiece of architecture, construction and sustainability. Key design elements include a six-acre “living roof” that houses thousands of indigenous plants. About 40% of the building is suspended over water with the foundation specifically designed … Read More
Keeping Markham’s Community Clean with a Sturdy Waste Management Facility Background While Miller Waste Systems Inc.’s waste management facilities were thriving in the late 2000s, the company wasn’t as impressed with their facility floors. Those concrete slabs just didn’t have the right amount of resistance to surface abrasion and the intense weight from dump trucks … Read More
Giving Construction Teams a Reliable Alternative to Bentonite Waterstops Background Described as one of the largest master-planned communities in North America, Concord Pacific Place is an extensive part of downtown Vancouver, covering 204 acres with both residential and commercial properties. Because of this significant ground coverage, it offers 9,100 residential units alongside 232,258 m2 (2.5 … Read More