Background The water table in Croatia is very high and traditionally concrete homes have problems with water penetration. As well, Croatia undergoes dramatic weather cycles, resulting in many problems with water seepage. Code requirements call for a roof membrane. However, in September, 1998 the first waterproof home was built in Europe without an exterior membrane … Read More
Background Bode’s Precast Inc. is a precast concrete manufacturer of septic tanks, drinking water containment tanks and tanks specifically for the agricultural sector. Their products are widely used by residential and commercial contractors and owners throughout the Whatcom, Skagit and Island Counties of Washington State, USA. Containment tanks are built in sizes ranging from 4700 … Read More
Background The complex at Cathedral Place has five (5) levels of underground parking. The structure was designed to extend to each of the site boundaries and conventional tanking of the building could not be considered. The use of Kryton's Krystol Internal Membrane (KIM) for tanking the building allowed maximum use of the available site as … Read More
Background A 3,250 square meter (35,000 square foot) parking deck raft slab required waterproofing and corrosion resistance. The raft slab was on grade but the property is situated below sea level. Engineers were concerned about wicking water and subsequent corrosion of reinforcing steel. As well there were virtually no joints or construction breaks to alleviate stress and … Read More
Background In 1985 and 1986, thirteen bridges on the newly constructed Coquihalla Highway required waterproofing treatment for the existing concrete infrastructure to protect the reinforcing steel from corrosion. Most of the bridges were constructed and treated during adverse winter weather conditions. Solution The Krystol T1 & T2 Waterproofing System was the only system compatible for wet … Read More
Background In the mid-1990's, the Annacis Island Wastewater Treatment Plant upgraded its largest treatment plant from primary treatment to secondary treatment. The upgrade was a significant investment valued at $470 million CDN, requiring new concrete construction and improvements to existing infrastructure. Krystol Internal Membrane (KIM) Admixture was specified for waterproofing base slabs and walls in … Read More
Background Richmond Aquatic Center was constructed in 1996 near the Fraser River in Richmond, BC. The facility’s 57 meter (187 feet) competitive pool has an 5.5 meter (18 foot) dive tank that is 3 meters (10 feet). below the water table. Because of the proximity to the ocean and major river system, the high water … Read More
Background To provide secure winter storage and facilitate fish recapture, TID built an artificial pond. The 119,000 gallon pond has a surface area of 80′ x 47′ with a depth of 8′ and a recessed tank in the bottom. The recessed tank aids in capturing the fish for restocking the canals in spring. A problem … Read More
Background Sorsmolt AS has a long history in the salmon industry and raise their own fingerlings and smolts. The company contacted AquaOptima with an ugent need for salmon smolt tanks due to over-production of fingerlings and a lack of other manufacturers ability to supply tanks in time to meet their needs. AquaOptima turned to Octaform. … Read More
Background When the owners of this high-end home decided to build a swimming pool on the second floor, unique construction techniques were required. Shotcrete was chosen for design flexibility and ability to maximize the use of available space. Constructed above luxury living space, it was essential that the suspended pool be watertight and resistant to … Read More